top of page

Miami Dade College
Medical Campus Terrazzo

PROJECT OVERVIEW

This expansive project entails the demolition of approximately 20,000 square feet of existing flooring and the succeeding installation of terrazzo flooring. It will be executed in two distinct phases for optimal efficiency and minimal disruption. The initial phase, involving the demolition, is scheduled for the Summer Break of 2024. Subsequently, the installation of the terrazzo will be conducted in multiple sections, carefully coordinated to ensure seamless integration with ongoing classes and events.

 

 

Current Phase: Pre-Construction

Completion Date: TBD
Construction Services Provided: CM Negotiated Contract

Owner: Miami Dade College

Owner Contact: Sheila Iglesias-Del Sol
Email: Siglesia@mdc.edu

Phone: 305-237-2560

Architect/Engineer: Harvard Jolly Architecture

Contact Us

Address

8000 NW 31st St, Unit #5
Doral, FL 33122

Contact

Opening Hours

Mon - Fri

7:00 am - 5:00 pm

Saturday

Closed

​Sunday

Closed

bottom of page