PROJECT OVERVIEW
About 20,000 sq ft of flooring replaced with terrazzo, phased around the summer break and classes.

Demolition of about 20,000 sq ft of existing flooring and installation of new terrazzo, phased so demolition ran over the summer break and the terrazzo went in section by section around ongoing classes and events.