Construction expertise
across campus facilities.

Ground-up and envelope

Garages and sitework

Floors and finishes

Student Spaces

Teaching Labs

Research Labs


AHC5 research labs 456 to 458 renovation
Florida International University (FIU)
Renovation of labs 456 to 458 for new tissue culture rooms, wet labs, a dark room and an environmental room to house a prefabricated cold room. Electrical, mechanical and plumbing systems were reconfigured, and new medical air, vacuum and CO2 gas lines were installed.

Medina Aquarius facility repair
Florida International University (FIU)
Significant structural upgrades to an existing building. The roofing system, gypsum roof deck, acoustical ceiling, lights and mechanical system were removed and replaced with a new metal roof deck and roofing, a new parapet, exterior lighting, stucco and paint. Inside, new mechanical and electrical systems, ductwork, lighting and acoustical ceilings.

CSC 3rd and 4th floor renovation
Florida International University (FIU)
Renovation of the Controller's department on the 3rd and 4th floors of the CSC building. All finishes were replaced and the conference rooms were rebuilt for new layouts, IT and furniture. The work was phased around staff and visitors in the occupied building, with dust controlled and noisy work scheduled for the least disruption.

College-wide student services refresh, phases 1 and 2
Miami Dade College
Refresh of the Student Services departments at all nine Miami Dade College campuses on a tight deadline. The scope included repainting, coordinating the design and installation of infographics and banners, and new flooring, with planning and communication set up early.

Wolfson student life renovation
Miami Dade College
Complete renovation of the Student Life area on the ground floor of Building 2000 at Wolfson Campus: full interior demolition, then new partitions, ceilings, lighting, millwork, flooring and furnishings, with MEP, fire alarm and fire protection upgraded to suit the new layout.

Padrón garage structural repairs
Miami Dade College
Structural restoration of multiple levels of an active parking garage, including the entrance ramp: removing deteriorated concrete, treating or replacing corroded rebar, and reforming and pouring damaged areas. Completed over the summer recess with a noise ordinance permit and extended work hours.

OCCUPIED-CAMPUS PROCESS
A construction plan built around campus operations.
01
Plan Around Students and Staff
Phasing built around semesters, exams and campus events, agreed with your facilities team before we start.
02
Protect the path
Barriers, dust control and safe routes keep students and staff moving past the work zone.
03
Work Around Students and Staff
Noisy work scheduled for breaks, after hours and weekends, with noise permits when needed.
04
Hand back clean
Final cleaning, inspections and punch list closed so rooms reopen on schedule.
Questions facility managers ask us
Yes. We plan the phasing around semesters, exams and campus events, and save the loudest work for breaks and after hours. At MDC’s Padrón garage we pulled a noise ordinance permit and ran extended hours to finish over the summer break.
Yes. We work with our clients using different delivery methods and contract types depending on their needs.
Yes. We phase work room by room and floor by floor so classrooms, offices and student services stay open.
Yes. When a campus needs it, we schedule noisy or disruptive work after hours, on weekends and during breaks. We've run extended hours to finish certain projects with tight deadlines.
No project is too small or too large for our team.