top of page
Mount Sinai - MSOP 3rd Floor Clinics - 03.jpg
Mount Sinai - MSOP 3rd Floor Clinics - 01.png

HEALTHCARE construction

Planned around
patient care

D.Torr builds and renovates imaging suites, laboratories and clinical spaces in active medical facilities. We coordinate phasing, infection control containment, access and utility shutdowns with your facilities and clinical teams, so construction can move forward while care continues.

Request our Medical Construction Portfolio.

SERVICES

Specialized spaces.
Experienced construction teams.

Imaging

Clinical departments

Labs

Medical offices

Public areas

Equipment installs

Grossing room and lab at Miami Cardiac & Vascular Institute, Baptist Health, renovated by D.Torr Construction

MCVI grossing room and lab renovation

Baptist Health

Renovation of the grossing room and lab at Miami Cardiac & Vascular Institute.

3T MRI suite at UHealth's Bascom Palmer Eye Institute in Miami, built by D.Torr Construction

Bascom Palmer Eye Institute MRI 3T

UHealth

Buildout of a 3T MRI suite and x-ray room at Bascom Palmer Eye Institute.

Radiation therapy and CT simulation rooms at a Baptist Health South Florida cancer center, built by D.Torr Construction

Cancer center radiation therapy and CT simulation

Baptist Health South Florida

Radiation therapy and CT simulation work at a cancer center.

Renovated GI procedure rooms at Mount Sinai Medical Center by D.Torr Construction

GI procedural rooms

Mount Sinai Medical Center

Renovation of 1,575 sq ft on the second floor of an outpatient GI facility, turning five small procedure rooms and an instrument processing area into four larger procedure rooms and clean storage. Included new reheat coils and exhaust fans, sprinkler rework, plumbing, lighting, a new panel, and nurse call and access control updates.

Outpatient MRI suite remodel (Suite 105W) for Baptist Health South Florida by D.Torr Construction

Outpatient MRI suite remodel (Suite 105W)

Baptist Health South Florida

Full remodel of Suite 105W for a new MRI unit, with changing rooms, a reading room, an IV prep room, a bathroom, two waiting areas and check-in.

Third-floor urology and GI surgical clinics at Mount Sinai Medical Center, renovated by D.Torr Construction

Third-floor urology and GI surgical clinics

Mount Sinai Medical Center

Interior renovation of about 15,102 sq ft of medical office space for two clinics, with waiting areas, exam rooms, procedure suites, offices, restrooms and admin space. New ductwork off existing air handlers, a new branch panel, extended plumbing, new sprinkler mains and branches, and refreshed elevator and toilet lobbies.

Doctors Hospital MRI suite and mobile MRI pad for Baptist Health South Florida in Coral Gables, FL, built by D.Torr Construction

Doctors Hospital mobile MRI and interior MRI suite

Baptist Health South Florida

Two-phase project at Doctors Hospital to expand MRI capacity. Phase one installed a temporary mobile MRI scanner, with site work including new sidewalks, awnings, lighting and electrical infrastructure, and relocated car chargers. Phase two fully renovated a 1,263 sq ft imaging area for a Siemens Magnetom Sola XJ, reconfiguring the space for better use, adding support areas and improving patient flow.

New x-ray room at Mount Sinai Medical Center's Aventura medical suite, renovated by D.Torr Construction

Aventura x-ray renovations

Mount Sinai Medical Center

Two-phase expansion of an active medical suite on the second floor. Phase one added two x-ray rooms with shielding, Unistrut supports and supporting infrastructure, plus a dressing room, exam rooms and a sub-waiting room tied into the occupied suite. Phase two fully renovated two existing exam rooms. All work ran after hours and on weekends so the practice kept operating.

Renovated fluoroscopy room at South Miami Hospital, Baptist Health South Florida, built by D.Torr Construction

South Miami Hospital fluoroscopy renovation

Baptist Health South Florida

Demolition of an existing fluoroscopy room, adjacent offices and bathrooms to relocate the bathrooms and build a larger fluoroscopy room and a new waiting room. Electrical and low-voltage systems were upgraded for new Siemens equipment, and lead-lined walls contain radiation. Work in the active radiology department hallways was closely coordinated with the hospital.

GI scope cleaning department at Mount Sinai Medical Center, built by D.Torr Construction

GI scope cleaning department

Mount Sinai Medical Center

A sterile scope cleaning room for the Gastroenterology Department, with MEP systems sized for four scope cleaning machines and provisions for future expansion. The project also added a dirty room, equipment storage and a pass-through window, all within a compact footprint.

Graduate Medical Education suite at South Miami Hospital, Baptist Health South Florida, renovated by D.Torr Construction

South Miami Hospital GME renovation

Baptist Health South Florida

Renovation of about 2,678 sq ft on the hospital's first floor for a new Graduate Medical Education suite: four on-call sleep rooms, bathrooms, offices, a lounge and support space for residents. Adjacent Medical Records and Volunteer Services were reconfigured, with MEP and fire protection modified throughout.

UHealth Medley office renovation for University of Miami Health by D.Torr Construction

UHealth Medley office renovations

University of Miami Health

Renovation of three areas across the first and second floors of an occupied building, with new MEP systems and upgraded finishes, to house a new call center and financial department for the UHealth system.

PET/CT and cyclotron imaging suite at Medsquare Kendall for The Neurology Group (Ionetix), built by D.Torr Construction

Medsquare Kendall PET/CT and cyclotron

The Neurology Group (Ionetix)

4,500 sq ft interior build-out of a shell space for an imaging program: a PET/CT scanner, a modular cyclotron and provisions for a future scanner and cyclotron. Included a new FPL room, equipment shielding, HVAC and electrical work, control rooms, offices and conference rooms.

Theranostic medical office with PET/MRI suite at Med Square Suite 103 for CIRA Health, built by D.Torr Construction

Med Square Suite 103

CIRA Health

3,400 sq ft theranostic medical office build-out of an empty suite in an existing building, with a PET/MRI and its control and equipment rooms, sleep rooms, a family room, doctor offices, exam rooms and a laboratory.

Renovated medical office building for The Neurology Group by D.Torr Construction

The Neurology Group medical office renovation

The Neurology Group

Full renovation of a 7,800 sq ft medical office building. New storefronts and exterior ADA work, a complete interior build-out and new MEP systems, delivering 14 exam rooms, 8 doctor offices and a research area with lab space.

NSC Infusion Center renovation with MRI, therapy gym and infusion area, by D.Torr Construction

NSC Infusion Center renovation

NSC Infusion Center

Full renovation of a 7,800 sq ft medical office building, with new exterior walls for better patient routing, exterior ADA improvements, and a complete interior build-out and MEP installation. The program includes an MRI, a therapy gym, infusion therapy, exam rooms, offices and consult rooms.

Renovated public lobby restrooms at University of Miami Hospital by D.Torr Construction

South Building and main lobby public restrooms

University of Miami Hospital

Renovation of the men's and women's restrooms in both the South Building lobby and the main lobby to current facility standards, replacing all finishes, plumbing fixtures, light fixtures and accessories.

South Miami Hospital board room next to the doctors' dining room, Baptist Health South Florida, built by D.Torr Construction

South Miami Hospital board room in doctors' dining

Baptist Health South Florida

Full build-out of a former shell space next to the Doctors Dining Room as the hospital board room. The finish upgrade required close coordination across trades and specialized IT for the conference room, with sound control so outside noise and equipment noise stay out of meetings.

Great work starts with the right people

Looking to join our team or work with us as a subcontractor? We welcome people who take pride in their craft, communicate clearly and keep safety at the center of the job. Tell us about your experience and the work you do.

Work with us

OCCUPIED-FACILITY PROCESS

A construction plan built around patient care.

01

Plan with your teams

Infection control risk assessment, AHCA requirements and a phasing plan reviewed with facilities and infection prevention.

02

Seal the work zone

Our own crew builds the containment and keeps it sound until the space is handed back.

03

Work around care

Noisy and dusty tasks scheduled around patient care, with protected paths for patients and staff.

04

Hand back clean

Final cleaning, inspections and punch list closed by our own crew.

Questions facility managers ask us

  • Yes. Our own crew sets up and maintains ICRA containment from day one until the space has been turned over. We use modular walls, negative air machines with HEPA filtration, and walk-off mats at every entry. We inspect the containment daily and log it, so your infection prevention team can review as needed.

  • Yes. Our team has extensive experience with AHCA projects at numerous hospitals throughout South Florida. Our team works hand in hand with our clients and the design teams to ensure AHCA inspections are passed the first time.

  • Yes. Most of our healthcare projects are located in departments that need to remain open during construction. We phase the scope with your facilities and clinical managers, keep egress and patient paths clear, and schedule utility shutdowns ahead of time with written notice. Our goal is to minimize disruption to surrounding areas so the facility can continue to operate seamlessly.

  • Yes. We regularly schedule demo, noisy work, shutdowns and tie-ins after hours or on weekends to stay out of the way of patient care. We plan those shifts up front so they're priced into the bid, not added later as change orders.

  • We take on everything from single-room renovations and equipment installs to full department build-outs and multi-phase renovations.

bottom of page