A third-floor refresh with a new student café, plus a rebuilt parking lot outside, at Miami Dade College's West Campus.

CLIENT

Miami Dade College

DELIVERY

CM at Risk (GMP)

SCOPE

Flooring, doors and a student café, parking lot and landscape work.

ARCHITECT

Via Design Studio

STATUS

Completed

THE PROJECT

One budget, two very different job sites.

A two-part refresh at Miami Dade College's West Campus: new flooring and doors throughout the third-floor offices, classrooms and common areas, a new student café and finishing details, plus parking-lot improvements with new landscaping and refinishing.

HOW IT WAS DELIVERED

01

Café and lounges

New flooring, doors, ceilings, lighting and finishes across the third floor.

02

Parking lot rebuilt

Resurfacing, new site features and fresh landscaping.

03

Every price reviewed

Subcontractor pricing and change orders checked against the budget.

04

Every step logged in Procore

Dated photos, daily logs and pay applications, shared in real time.

Before: West Campus refresh

BEFORE

After: West Campus refresh

AFTER

THE CHALLENGE

An occupied floor and a parking lot, on one schedule.

The project pulled in a wide range of trades across two very different areas, an occupied interior floor and an exterior parking lot, so coordination, budget control and clear records were essential.

our approach

Price early, track both scopes, document everything.

Construction step 1: West Campus refresh

01

Price the trades early

Pricing for flooring, doors, finishes, the café and site work was gathered early, and estimates were updated at each planning milestone.

Construction step 2: West Campus refresh

02

Track both scopes

Interior and site budgets were tracked side by side through construction, so a change on one never caught the other by surprise.

Construction step 3: West Campus refresh

03

Check every number

Every subcontractor price and change order was reviewed before it reached the college.

Construction step 4: West Campus refresh

04

Keep one shared record

Procore held dated photos, daily logs and subcontractor pay applications, giving the college and the design team the same up-to-date picture.

from the field

Construction Sequence

RELATED PROJECTS

More projects like this.

College-wide student services refresh, phases 1 and 2

Miami Dade College

College-wide student services refresh, phases 1 and 2

Paint, graphics, banners and flooring for Student Services at all nine MDC campuses, on a tight deadline.

Read More

Education

Wolfson student life renovation

Miami Dade College

Wolfson student life renovation

Full interior renovation of the Student Life area in Building 2000, with MEP and fire systems updated.

Read More

Education

CSC 3rd and 4th floor renovation

Florida International University (FIU)

CSC 3rd and 4th floor renovation

Phased renovation of two occupied office floors, with rebuilt conference rooms and all-new finishes.

Read More

Education

North Campus tutoring rooms, phase 1

Miami Dade College

North Campus tutoring rooms, phase 1

Eight tutoring rooms in Building 2000, about 9,507 sq ft, with new flooring, furniture and paint.

Read More

Education

bottom of page